摘要
结合具体工程实例,提出了高水位时码头平台的施工方案,并通过梁板支撑骨架的计算验证了增加桩帽、设置支撑骨架的方案可行的结论,可供高水位时码头平台施工工程参考。
Combined with the specific engineering example, the dock platform construction plan at high water level was proposed. Through calculation of beam supported frame, the conclusion that the plan of pile capping increasing and installing supported frame was feasible was checked, which can be referenced for the dock platform construction at high water level.
出处
《山西建筑》
2008年第24期359-360,共2页
Shanxi Architecture
关键词
水位
码头
平台
施工
water level, dock, platform, construction