摘要 先张法预应力混凝土管桩(PHC)是采用先张法预应力工艺和离心成型法制成的一种圆筒体细长混凝土预制构件.实际应用表明,该种桩型质量稳定可靠,桩身砼强度高,耐打压性能好,穿透能力强,单桩承载力高,造价相对较低;它对不同沉桩工艺适应性强,吊运方便,接桩快捷,桩长易调整,成桩质量好,检测时间短. Prestressed high - strength concrete (PHC) pipe pile is a kind of cylindrical and slender precast concrete units which is prepared by pretensioned prestressed technics and centrifugal shaping methods. Actual application indicates that PHC pipe pile has distinct advantages, such as stable and realiable quality, high strength, better resistance of the pressure, good ability of puncturing, high capacity of single pile and lower cost. Additionally, PHC pipe pile is suitable for various pile sinking technology, cinvenient to lift and joint, easy to adjust the pile length. So, the time limit for a project is shortened and the quality of pile is improved.
出处 《河南理工大学学报(自然科学版)》 CAS 2008年第3期344-347,共4页 Journal of Henan Polytechnic University(Natural Science)
关键词 PHC管桩 基础工程 预应力 PHC pipe pile foundation works pre -tensioned
  • 相关文献

参考文献4

二级参考文献8

  • 1GB50007-2002.建筑地基基础设计规范[S].[S].,..
  • 2DBJ/T15-22-98.预应力混凝土管桩基础技术规程[S].[S].,..
  • 3褚长有等.管桩应用中的几个问题[A].桩基工程技术进展(2005)[C].刘金砺主编.北京:知识产权出版社,2005
  • 4GB13467-1999.先张法预应力混凝土管桩[S].
  • 5JGJ94-94],建筑桩基技术规范[S].
  • 6重庆市建筑地基基础设计规范[J]建筑结构,1995(05).
  • 7沈华鑫,李家辉.持力层软化对预应力管桩承载力的影响[J].广东土木与建筑,2003,10(6):11-12. 被引量:5
  • 8徐天平,李素华.泥岩持力层的管桩承载力试验研究[J].岩石力学与工程学报,2004,23(2):329-333. 被引量:12

共引文献11

同被引文献118

引证文献10

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部