摘要
对运行了10a的氨汽提装置4台高压设备进行全面检测,根据大修期间腐蚀检测情况,结合设备自身的特点,论述斯那姆氨汽提尿素装置高压设备的腐蚀问题。
An overall detection of 4 HP equipments was done to the ammonia stripping plant which has operaed over 10 years. According to the corrosion detected during overhaul and in combination with the equipment characteristics, presents the corrosion problem of the HP equipment of urea plant with Snamprogetti ammonia stripping process.
出处
《大氮肥》
CAS
2008年第1期14-16,共3页
Large Scale Nitrogenous Fertilizer Industry
关键词
斯那姆氨汽提
高压设备
腐蚀
Snamprogetti ammonia stripping process, HP equipment, corrosion