摘要
描述了浆纸厂暖通空调系统调试及生产运转中的问题,针对问题进行了分析与技术改造处理,实际运转表明,处理措施均是可行的,获得了满意的效果,最后提出了几点建议。
The problems in commissioning and runing of heating, ventilation and air-conditioning system in a pulp and paper mill are described and technical renovation has been carried out for the problems. The actual operation indicates that the measures are feasible with desirable effect. Some suggestions are put forward in the end.
出处
《中华纸业》
CAS
北大核心
2008年第16期76-79,共4页
China Pulp & Paper Industry
关键词
暖通空调系统
调试
运转
问题
技术处理
建议
heating ventilation and air-conditioning equipment
test run
runing
problem
technological treatment
suggestion