摘要 宝泉抽水蓄能电站引水系统斜井施工中,由于多种因素的影响,反导井无法实现测量控制。施工单位引进国产的新工艺激光,利用国产激光安装方便的特点,在斜井上下安装了两套激光系统,达到了控制反导井的目的。反导井贯通精度远远小于规范规定,且工期提前。该方法的研究与应用完善了斜井施工测量工法,彻底解决了斜井反导井测量控制的难题。 During the construction of the inclined shaft in the water diversion system of Baoquan Pumped Storage Power Station, for a variety of factors, the measurement control can not be achieved in the reverse well. The contractor introduced homemade latest technique laser which posses easy to install, and two sets of laser system are installed from top to bottom in the inclined shaft to realized back well control. Its perforation precision is far smaller than standard, and the construction period short. The method of study and application has improved construction measurement of the inclined shaft, and resolved the difficult problems of the reverse measurement control in inclined shaft.
作者 李伟 王振军
出处 《吉林水利》 2008年第8期28-32,共5页 Jilin Water Resources
关键词 激光接力投点 导向控制 研究与应用 laser relay point, orientatin Control, Research and Application
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部