摘要
地铁总联调是庞大且复杂的系统工程,通过数据库可以对工程的实施过程进行精确的过程控制。同时,利用数据库在总联调过程中收集设备(系统)调试信息,可以为今后建立维修专家系统奠定良好的基础。
Metro comprehensive system integration and commissioning is a huge and complicate systematic project.Process control can be pre- cisely carried out for implementation of project by database. Meanwhile,debugging information of equipment (system) can be collected by using database during integrated test to settle a good foundation for future establishing a maintenance expert system.
出处
《现代城市轨道交通》
2008年第4期70-73,共4页
Modern Urban Transit