4Bowersox D, Closs D. Logistical management: The integrated supply chain [M]. New York: McGraw-Hill, 1996.
5Mummalaneni V, Dubas K M, Chao C. Chinese purchasing managers preferences in supplier selection [J].Industrial Marketing Management, 1996,25(2):115-124.
6Braglia M, Petroni A. A quality-assurance oriented methodology for handling trade-offs in supplier selection [J].International Journal of Physical Distribution & Logistics, 2000, 30 (2): 96-111.
7Towll D R, Vecchio A D. The application of filter theory to the study of supply chains dynamics [J]. Production Planning and Control, 1994, 5(1): 82-96.
8Christy D P, Grout J R. Safeguarding supply chain relationships [J]. International Journal of Production Economics, 1994,( 36 ):233-242.
8T Prabaharam, P R Nakkeeran, N Jawahar. Sequencing and scheduling of job and tool in a flexible manufacturing cell [J]. Int J Adv Manuf Technol, 2006,29:729 -745.
9P Udhayakumar, S Kumanan. Sequencing and scheduling of job and tool in a flexible manufacturing system using ant colony optimization algorithm [ J ]. Int J Adv Manuf Technol, 2010,50 : 1075 - 1084.
10D de Werra, M Wider. Loading problems with tool management in flexible manufacturing systems: A few integer programming models [ J ]. Int J Adv Manuf Technol, 1990 ( 3 ) : 71 - 82.