综采面3.3kV供电设备的配置运行 被引量:1

Configuration of 3.3 kV Power-Supply Equipment of the Fully Mechanized Mining Face
原文传递
导出
摘要 针对井下超长综采面1.14 kV 高压供电线路电能损耗大,影响大功率采煤机的应用的现状,四川芙蓉矿务局松澡煤矿对供电电压进行了升级改造,由1.14 kV 升级到3.3 kV。分析了对超长综采工作面采煤巷道进行的优化布置,并对工作面采用3.3 kV 电压工作的设备运行状况的科学配置作了论述。实践证明降低了设备启动和运行电流,保证了供电系统的安全运行。 Considering the electric energy consumptions of the high voltage line of underground fidly-mechanized mining face and the effects of using the high-power coal mining machine, the Songzao coal mine of Furong Alining Bureau in Sichuan has upgraded power supply units, voltage boosting from 1.14 kV to 3.3 kV. This paper analyzes optimized layout of the coal tunnels in the lengthy fully-mechanized mining face and discusses its working scientific configuration. This reformation decreases its initial and working current and assures the whole system works safely.
作者 彭焕荣
出处 《矿山机械》 北大核心 2008年第15期19-21,共3页 Mining & Processing Equipment
基金 国家自然科学基金 西南地区地下工程岩爆机制及其地质力学模式研究(40772176)
关键词 3 3KV供电 综采工作面 巷道 3.3 kV power supply Fully-mechanized mining face Coal tunnel
  • 相关文献

参考文献2

  • 1于景文,李富群.现代化煤矿采煤新工艺、新技术与新标准实用全书[M].吉林:吉林科技出版社,2006
  • 2朱磊,王为丽,陈鸿章.综采工作面可靠性分析[J].山西煤炭,2006,26(1):22-24. 被引量:3

二级参考文献5

共引文献2

同被引文献5

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部