摘要
在实际整体煤气化联合循环(IGCC)工程项目进行详细的经济性计算之前,通常需要进行估算,从而对项目的经济性有较为清楚的了解.将国外估算模型与国内目前燃气轮机联合循环电厂的实际经济数据相对比,以获取较为准确的参照标定,确定适用于我国的关键参数和各类计算因子,并对其基本方法进行一定的改进,从而最终建立适用于我国的IGCC经济性估算模型.
Before detailed economic assessment of a real integrated gasification combined cycle (IGCC) project, a primary estimation is necessary to provide a basic understanding towards the economics of the specified project. A more accurate reference calibration was obtained by comparing the calculation results from foreign economic models with actual economic data in China's gas turbine combined cycle power plants. Key parameters and various calculation factors were selected and specified in the economic model. Basic methodology was also modified to fit ChinEs economic assessment practice.
出处
《动力工程》
EI
CSCD
北大核心
2008年第4期633-638,共6页
Power Engineering
基金
国家973课题资助项目(2005CB221207)