中国整体煤气化联合循环电厂的经济性估算模型 被引量:9

Integrated Gasification Combined Cycle Economic Estimation Model of China
下载PDF
导出
摘要 在实际整体煤气化联合循环(IGCC)工程项目进行详细的经济性计算之前,通常需要进行估算,从而对项目的经济性有较为清楚的了解.将国外估算模型与国内目前燃气轮机联合循环电厂的实际经济数据相对比,以获取较为准确的参照标定,确定适用于我国的关键参数和各类计算因子,并对其基本方法进行一定的改进,从而最终建立适用于我国的IGCC经济性估算模型. Before detailed economic assessment of a real integrated gasification combined cycle (IGCC) project, a primary estimation is necessary to provide a basic understanding towards the economics of the specified project. A more accurate reference calibration was obtained by comparing the calculation results from foreign economic models with actual economic data in China's gas turbine combined cycle power plants. Key parameters and various calculation factors were selected and specified in the economic model. Basic methodology was also modified to fit ChinEs economic assessment practice.
出处 《动力工程》 EI CSCD 北大核心 2008年第4期633-638,共6页 Power Engineering
基金 国家973课题资助项目(2005CB221207)
关键词 能源与动力工程 IGCC 经济性 估算模型 成本 energy and power engineering IGCC economics estimation model cost
  • 相关文献

参考文献5

  • 1Rosenberg, William G. , Alpern Dwight C. , et al. Financing IGCC-3party covenant, BSCIA working paper 2004-01, Energy technology innovation project[R]. Belfer Center for Science and International Affairs.
  • 2Tampa Electric. Integrated gasification combined-cycle project[R]. An update topical report. July, 2000.
  • 3DOE/NETL. Tampa electric integrated gasification combined-cycle project a DOE assessment [R]. December, 2004.
  • 4焦树建.IGCC的某些关键技术的发展与展望[J].动力工程,2006,26(2):153-165. 被引量:53
  • 5Robert Williams. Financing IGCC-3party covenant 91 revenue requirements for regulated electric utilities (EPRI methodology)[R]. 15, April 2004.

二级参考文献23

  • 1吴枫,闫文艳,阎承信.关于开发IGCC煤气化装置的探讨[J].燃气轮机技术,2005,18(2):13-17. 被引量:6
  • 2焦树建.欧洲的IGCC示范工程与研发工作[J].燃气轮机技术,2006,19(2):1-10. 被引量:13
  • 3新型IGCC方案的研究[M].MPS,1997,NOV.
  • 4Gas Turbine World 2004-05 GTW Handbook[H].A Peguot Publication,Vol.24 P.37 ~ 40.
  • 5焦树建.论设计IGCC电站时燃气轮机的选取原则[J].燃气轮机发电技术,2004,2(2).
  • 6Irwin Stamber.Gasification meeting looks at new petcoke plants and IGCC design[J].Gas Turbine World,2000,30(6):22~ 25.
  • 7Victor de Biasi.Targeting turbine nesearch needed to burn syngas and hydrogen fuels.Gas Turbine World.2005.35(1):28~ 30.
  • 8Irwin Stamber.DOE shifting from design studies to technology oriented Programs[J].Gas Turbine World,2002,32(2):17 ~ 23.
  • 9Plant engineering and support,high-efficiency HRSGS for cycling and daily start-stop combined cycles[J].Gas Turbine World,2005,35(1):20 ~ 21.
  • 10Rokert Farmer.IGCC Power Generation Plants in Commercial Stage of development[J].Gas Turbine World,2004,34(5):16 ~ 23.

共引文献52

同被引文献92

引证文献9

二级引证文献37

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部