洪家渡200m级高面板堆石坝变形控制技术 被引量:28

Deformation control techniques for 200 m-high Hongjiadu Concrete Face Rockfill Dam
下载PDF
导出
摘要 针对已建200 m级高面板堆石坝出现的问题,结合洪家渡坝工程特点,开展了坝体变形特性及控制技术研究。探讨了200 m高坝变形规律与特点,从筑坝材料选择、堆石结构分区及填筑施工等方面进行坝体变形控制,提出了堆石预沉降控制量化指标,提高堆石压实度、坝内陡边坡整形与设增模碾压区、填筑施工总体平衡上升等变形控制集成技术,并应用于洪家渡坝,取得了坝体变形小、面板无结构性裂缝和坝体渗漏量小的良好效果。 With regard to the existing problems in 200 m-high concrete face rockfill dams (CFRD) and combined with the characteristics of Hongjiadu CFRD project, a study was performed on the deformation characteristics and the deformation control techniques for the dam body. The rules and characteristics of about 200 m-high CFRD were discussed. The dam deformation could be controlled through the optimal choice of rockfill materials, reasonable division of structural zone of rockfill and right rockfill compaction construction. Integrated techniques of CFRD deformation control were brought forward, such as the quantity index for controlling rockfill pre-settlement, the high compaction degree of rockfill, the shaping of steep abutment and the filling of rockfill with higher modulus near the steep abutment and the filling of dam for small height differemce as possible. Some goals as small dam deformation, no structural cracks and little seepage through the dam were achieved by adopting the above integrated CFRD deformation control techniques.
出处 《岩土工程学报》 EI CAS CSCD 北大核心 2008年第8期1241-1247,共7页 Chinese Journal of Geotechnical Engineering
关键词 洪家渡水电站 200 m级高面板堆石坝 变形控制技术 Hongjiadu Hydropower Project 200 m-high CFRD deformation control technique
  • 相关文献

参考文献3

二级参考文献2

共引文献13

同被引文献276

引证文献28

二级引证文献133

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部