摘要
介绍了黑启动电源应具备的条件,分析了张河湾抽水蓄能电站作为黑启动电源的条件,以及黑启动的设计控制流程,介绍了黑启动的具体步骤和效果。
The rules for selecting the black start power supply are introduced. Analysis is made of the conditions of the Zhanghewan Pumped Storage Power Station as a black start power supply, as well as the control flow for the design of black start. The test steps and results of the black start are also introduced.
出处
《水电自动化与大坝监测》
2008年第4期30-32,共3页
HYDROPOWER AUTOMATION AND DAM MONITORING
关键词
抽水蓄能电站
黑启动电源
电网
pumped storage power station
black start power supply
power grid