摘要
简述了电磁式沉降仪安装中存在的问题,并对其进行了分析,介绍了采用高塑性膨润土水泥灌浆方式成功安装电磁式沉降仪的方法,分析了基础覆盖层的沉降测量结果。
The problems in the installation of electromagnetic settlement gauges are analyzed briefly. The method of using high plasticity bentonite cement grouting in successful installation of electromagnetic settlement gauges is introduced. And the settlement measurement results of the foundation overburden layer are analyzed.
出处
《水电自动化与大坝监测》
2008年第4期54-55,58,共3页
HYDROPOWER AUTOMATION AND DAM MONITORING
关键词
粘土心墙坝
覆盖层
电磁式沉降仪
高塑性膨润土水泥灌浆
clay core dam
overburden layer
electromagnetic settlement gauge
high plasticity bentonite cement grouting