摘要
北京音乐厅改造工程于2003年初动工,2004年底竣工。介绍了北京音乐厅的总体情况、音质设计、建筑装修材料构造、声学测量、座椅吸收以及其他有关情况。
Beijing Concert Hall renovation project was started in early 2003 and completed by the end of 2004. The overall situation, sound quality design, construction of building and decoration materials, acoustic measurement, sound absorption of seats, and other relevant issues are introduced.
出处
《电声技术》
2008年第8期12-17,21,共7页
Audio Engineering
关键词
北京音乐厅
音质
混响时间
早期衰变时间
明晰度
侧向反射声
Beijing Concert Hall
sound quality
reverberation time
EDT
clarity
early lateral reflection of sound