大亚湾核电站应急柴油发电机后撤时间延长的概率安全评价 被引量:2

Probability safety assessment for the extension of allowed outage time of emergency diesel generator in Daya Bay NPP
下载PDF
导出
摘要 使用概率安全评价的方法对大亚湾核电站应急柴油发电机的后撤时间延长进行了分析,分析中采用了美国核管会在审批许可证基准变更时所使用的风险可接受准则。评价结果表明应急柴油发电机的后撤时间从3天延长到14天的风险影响是可以接受的。 The article applies the Probability Safety Assessment approach to analyze the risk impact of extension of allowed outage time of emergency diesel generator in Daya Bay NPP and adopts the risk-acceptance criteria used by NRC to evaluate changes to the licensing basis. The assessment results show that the risk impact is acceptable to increase the emergency diesel generator allowed outage time from 3 days to 14 days.
出处 《核科学与工程》 CSCD 北大核心 2007年第4期349-354,共6页 Nuclear Science and Engineering
关键词 概率安全评价 应急柴油发电机 后撤时间 技术规范 probability safety assessment emergency diesel generator allowed outagetime technical specifications
  • 相关文献

参考文献9

  • 1USNRC. An Approach for Using Probabilistic Risk Assessment In Risk Informed Decisions On Plant-Specific Changes to the Licensing Basis[J]. Regulatory Guide 1. 174, Revision 1, November, 2002.
  • 2USNRC. An Approach for Plant Specific, Risk-Informed Decisionmaking: Technical Specifications [ J ]. Regulatory Guide 1. 177, August, 1998.
  • 3陈捷飞.应急柴油发电机后撤时间延长及在线维修的安全分析.大亚湾核电,2005,(1).
  • 4郭建兵.大亚湾核电站概率安全评价总报告[R],2004,2.
  • 5郑伟.大亚湾核电站概率安全评价总报告[R],2004,2.
  • 6冯炳良.在地震下部件易损度估算[J].2003,10.
  • 7广东核电合营有限公司.广东大亚湾核电站最终安全分析报告[R].修订版F版,英文版.
  • 8张宁.大亚湾核电站概率安全评价总报告[R],2004,2.
  • 9Framatome, Evolutionary M310 Nuclear Island Probabi listic Risk Assessment, May 1997.

同被引文献9

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部