河谷地形对面板坝防渗体系安全性的影响 被引量:6

Influence of valley topography on the safety of CFRD anti-seepage systems
下载PDF
导出
摘要 通过对实际工程案例的分析,河谷地形对面板防渗体系的影响主要在两个方面,基坑开挖形状和坝肩岸坡地形。本文通过引入摩擦接触来模拟堆石体与坝肩之间的接触关系,分析了不同岸坡坡度下堆石体的变形特性和岸坡发生转折的地形条件下堆石体的滑移性状,解释了面板在岸坡转折处发生破坏的原因。 Several concrete faced rockfill dam projects are analyzed and the valley topography influences the antiseepage systems in two ways: one is the shape of bed ground, the other is the slope gradient of abutment. Friction contact model is introduced to simulate the contact between rockfill and abutment. It is shown that rockfill is inclined to happen bigger horizontal displacement in wide and plain valley. Arch action of narrow valley declines the horizontal displacement of rockfill. So the slippage of rockfill along the slope results in the fragmentation of concrete slab at the corner.
出处 《水力发电学报》 EI CSCD 北大核心 2008年第4期94-100,共7页 Journal of Hydroelectric Engineering
关键词 水工结构 面板裂缝 摩擦接触模型 面板堆石坝 河谷地形 hydraulic structure slab cracks friction contact model concrete faced rockfill dam (CFRD) valley topography
  • 相关文献

参考文献10

  • 1Marques F P, Pinto N L S. CFRD dam characteristics learned from experience [J] . International Journal on Hydropower and Dams, 2005, 12(1): 72-76.
  • 2Amaya F. Golillas dam-design, construction and performance [ A]. CFRDS design construction and performance symposium on CFRD [C]. Detroit: ASCE, 1985:73-87.
  • 3Priseu R, Ioneseu S, Stematiu D. New model for movement analysis of roekfill dams [J]. Energia Elettrica, 1978, 55( 1 ) : 24 - 29.
  • 4朱晟,王继敏.建造在狭窄河谷上的高混凝土面板堆石坝[J].红水河,2004,23(4):81-84. 被引量:12
  • 5湖北清江水布垭水利枢纽工程蓄水安全鉴定报告(第一阶段)[R].北京:中国水电工程顾问集团公司,2006.
  • 6Marulanda A, Amaya F, Ramirez C A. Colombian experience with concrete face rockfill dams [ J ]. International Water Power and Dam Construction, 1991, 143( 1 ) : 25 - 32.
  • 7Viotti C B. Discussion on behavior of Brazilian Rockfill dams [ A] . Second Symposium on CFRD [ C] . Florianopolis: 1999.
  • 8Pinto N L. Questions to ponder on designing very high CFRDs [J]. International Journal on Hydropower and Dams, 2001, 8(5) : 61 - 65.
  • 9刘超,张光科.混凝土面板堆石坝面板周边结构性裂缝探讨[J].东北水利水电,2004,22(11):1-3. 被引量:4
  • 10宋文晶,高莲士.窄陡河谷面板堆石坝坝肩摩擦接触问题研究[J].水利学报,2005,36(7):793-798. 被引量:11

二级参考文献17

  • 1Zhu, S, Gu, G.C. CFRD Built on the Alluvial Deposit [A]. Proceedings International Symposium on High Earth-rock Fill Dams. Sponsored by ICOLD, CSHEE[C]. Beijing, Oct, 1993. 184-195.
  • 2Fitzpatrick, M. D. Ten Years Surveillance of Cethana Dam [A]. Transactions of the 14th ICOLD[C]. Q52 R51 847-866.
  • 3Regalado,G. Alto Anchicaya CFRD Behavior of the Concrete Face Membrane[A].Transactions of the 14th ICOLD[C].Q55 R30 517-536.
  • 4Amaya, F. Golillas Dam-Design, Construction and Performance[A]. CFRDS-design Construction and Performance Symposium on CFRD[C]. ASCE Detroit, Oct,1985.73-87.
  • 5阿马耶 马鲁兰达.格里拉斯坝的设计、施工和运行[A].见:水利电力部科学技术司 水利水电科学研究院编.国外混凝土面板堆石坝[C].北京:水利电力出版社,1988.256-271.
  • 6平托NL 勃林德S 托尼亚蒂NB.阿里亚和塞格雷多混凝土面板堆石坝的12年进展[A].见:中国水利发电工程学会 国际大坝委员会编.国际高土石坝学术研讨会论文集[C].北京:水利电力出版社,1993.259-271.
  • 7顾淦臣 朱晟.混凝土面板堆石坝三维非线性有限元静力动力分析程序(TSDA)[A]..水利水电工程设计分析计算软件包使用指南[C].北京: 科学技术出版社,1991.298-310.
  • 8郭兴文,王德信,蔡新,董利川.混凝土面板堆石坝流变分析[J].水利学报,1999,30(11):42-47. 被引量:38
  • 9朱晟,徐胜.现代混凝土面板堆石坝的进展[J].水利水电科技进展,1999,19(2):19-21. 被引量:7
  • 10弗莱塔斯,吴桂耀,勃卡提,阿拉亚,莫里,徐建周.天生桥一级水电站混凝土面板堆石坝面板电平器监测[J].水利水电技术,2000,31(6):39-43. 被引量:2

共引文献20

同被引文献51

引证文献6

二级引证文献42

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部