期刊文献+

西安地铁2号线穿越地裂缝的技术措施 被引量:22

Technical Measures for Xi'an Subway Line 2 to Traverse Ground Fissures
下载PDF
导出
摘要 西安地铁2号线是西安的第一条地铁线路,它穿过了13条地裂缝中的10条,西安地裂缝是在西安正断层组的基础上发育起来的,地裂缝的变形具有不可抗拒性和巨大的破坏性,会给隧道结构带来致命的危害,地裂缝引起的隧道结构破坏模式有两种:拉张-挤压破坏型和直接剪断破坏型。通过分析地裂缝的活动特征,估算出2号线沿线地裂缝的最大垂直位移量及百年变形量,分别阐述明挖法、浅埋暗挖法的结构处理方案,地裂缝处理的接头方案,地裂缝处的结构防水等技术措施。 Xi'an subway Line 2 is the first subway line in Xi' an which passes through ten of the thirteen ground fissures in the city. This paper introduces the causes of the formation of ground fissures and their effect on subway Line 2. There are two modes of damage to tunnel structures caused by fissures: tension-squeeze mode and direct shear mode. Maximum vertical displacements and one hundred years' deformations of the ground fissures along Line 2 are estimated by analyzing the activities of ground fissures. Options of structural treatment for open-cut and bored excavation, options for joint treatment at ground fissures, technical measures of structural waterproofing at ground fissures are put forward.
作者 樊红卫
出处 《都市快轨交通》 2008年第4期19-22,30,共5页 Urban Rapid Rail Transit
关键词 西安地铁 地裂缝 穿越 技术措施 Xi'an subway ground fissure traverse technical measure
  • 相关文献

参考文献2

  • 1[3]长安大学工程设计研究院.西安市城市快速轨道交通二号线详细勘察阶段沿线地裂缝勘察报告[R].西安,2007.
  • 2[6]机械工业勘察设计研究院,西北综合勘察设计研究院,等.西安市城市快速轨道交通二号线详勘报告[R].西安,2007.

同被引文献119

引证文献22

二级引证文献89

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部