期刊文献+

飞机供电系统的可靠性分析 被引量:4

Reliability Analysis on Power Supply System for a Certain Type of Plane
下载PDF
导出
摘要 与传统的把各个次序工作部件看成简单串联关系的方法不同,本文在研究具有冷贮备单元的某战斗机供电系统的可靠性评估问题时,提出了一种新方法,即利用拉普拉斯变换法计算贮备件不同时供电系统的可靠寿命和平均失效前时间。计算结果表明,本文方法不仅有效而且简单实用。 Different from traditional method that regards the re!ationship among working parts in various orders as that of simple ones in series, in the research on reliability assessment of power supply system for a certain type of fighter equipped with cool standby units the authors propose a new Laplace transform based method to calculate both reliable life and mean time to failure of power supply system for a certain type of fighter with different cool standby units. Calculation results show that the proposed method is simple, effective and practicable.
出处 《电网技术》 EI CSCD 北大核心 2008年第15期67-70,共4页 Power System Technology
基金 国家自然科学基金资助项目(70471057) 陕西省教育厅自然科学基金资助项目(03Jk065)。~~
关键词 独立供电系统 冷贮备单元 可靠寿命 平均失效 前时间 拉普拉斯变换 independent power supply system coolstandby unit reliability life mean time to failure Laplacetransform
  • 相关文献

参考文献8

  • 1张益平.飞机低压直流电源系统研究[J].西安:西北工业大学,20H01.
  • 2于敦.国外飞机供电系统手册[M].北京:中国航空信息中心,1997.
  • 3茂诗松,王玲玲.可靠性统计[M].上海:华东师范大学出版社,1984.
  • 4南京工学院数学教研组.积分变换[M].北京:高等教育出版社,1981.60-72.
  • 5朱起悦.有冷贮备单元的表决系统的可靠度分析[J].电子产品可靠性与环境试验,2006,24(3):32-35. 被引量:5
  • 6李孝全,张柏华.某新型雷达车主机发电系统可靠性分析[J].移动电源与车辆,2007,38(1):1-3. 被引量:2
  • 7Lu M, Rudy R J. Repairable system reliability prediction[C]. SAE Paper, 2004.
  • 8Misra K B. New trends in system reliability evaluation[J]. Fundamental Studies in Engineering, 1996, 1(16): 205-208.

二级参考文献6

  • 1丁定浩.可靠性与维修性工程[M].北京:电子工业出版社,1986.130-153.
  • 2陆孝庭.可靠性设计与分析[M].北京:国防工业出版社,1996.
  • 3GJB1909.4—94.装备可靠性维修性参数选择和指标确定要求-卫星[S].
  • 4.GJB235—87工、中频移动电站通用技术条件[S].北京:国防科工委军标出版发行部,1998..
  • 5李孝全,杨维群,魏小金.某地空导弹武器系统设备原理培训讲义之八—电源设备原理[M].西安:空军工程大学导弹学院,2005.
  • 6.GJB299—87电子设备可靠性预计手册[M].北京:国防科工委军标出版发行部,1998..

共引文献14

同被引文献33

  • 1穆新华,严仰光,于玉夫.飞机变速恒频电源系统可靠性的Monte-Carlo分析[J].南京航空学院学报,1993,25(1):1-9. 被引量:2
  • 2李红江,鲁宗相,王淼,朱凌志,焦绍光.基于可靠性模型的船舶电网拓扑结构对比分析[J].电工技术学报,2006,21(11):47-53. 被引量:28
  • 3祝小平,向锦武,张才文,等.无人机设计手册[M].北京:国防工业出版社,2007:274-278.
  • 4Ou Y, Singh C. Assessment of available transfer capability and margins[J]. IEEE Transactions on Power Systems, 2002, 17(2): 463-468.
  • 5Borges C L T, Falcao D M, Mello J C O, et al. Composite reliability evaluation by sequential Monte Carlo simulation on parallel and distributed processing environments [J]. IEEE Transactions on Power Systems, 2001, 16(2) : 203-209.
  • 6Chiquet J, Eid M, Limnios N. Modelling and estimating the reliability of stochastic dynamical systems with Markovian switching[J]. Reliability Engineering and System Safety, 2008, 93: 1801-1808.
  • 7Ke W J, Wang S D. Reliability evaluation for distributed computing networks with imperfect nodes [ J]. IEEE Transactions on Reliability, 1997, 46(3) : 342-349.
  • 8Pradlwarter H J, Pellissetti M F, Schenk C A, et al. Realistic and efficient reliability estimation for aerospace structures[J]. Computer Methods in Applied Mechanics Engineering, 2005, 194: 1597-1617.
  • 9Charruau S, Guerin F, Herndndez Dominguez J, et al Reliability estimation of aeronautic component by acceler ated tests[J]. Microelectronics Reliability, 2006, 46: 1451-1457.
  • 10Jirutitijaroen P, Singh C. Comparison of simulation methods for power system reliability indexes and their distributions[J]. IEEE Transactions on Power System, 2008, 23 (2):486-493.

引证文献4

二级引证文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部