东河塘地面建设总图设计打破了生产设备按油、气、水等专业分区布置的模式,实现了按工艺、按生产过程布置,使集中处理站成为一个真正的有机整体。主要生产工艺设备布置以管架为中心;管道和电缆采用架空和埋地敷设,中心控制室代替了部分围墙;采用高效率,高质量设备和橇装装置;实现了高度自动化管理。
The production equipment mode of specialized area arrangement classified by oil、gas and water was broken by general drawing design of surface construction in Dong Hetang. The center treating station was become a real organic integration, which was realized the arrangement according to technology and production process. The main production equipments were arranged by taking pipe carrier as the center. Pipeline and cable were arranged by using the ways of aerial pipeline and buried laying. The part of enclosing wall was replaced by the center control room.The high efficiency and high quality equipments and the skid mounted unit were adopted. The automatic admistration of high plane was reached.