摘要
该文结合近几年市政截污工程的施工经验,从管道铺设前的准备、管道铺设及管沟回填三个方面,就其施工的全过程作了阐述,提出了相应的质量控制要点,以指导现场施工。
Combined with the construction experience of the municipal sewage interception works in recent years, the article sets forth all process of the construction and puts forward the relative quality control gist to indicate the field construction from three aspects of the preparation before the pipe paving, the pipe pavement, and the backfill of pipe ditches.
出处
《城市道桥与防洪》
2008年第8期138-140,共3页
Urban Roads Bridges & Flood Control
关键词
市政工程
排水管道
质量控制
惠州市
municipal engineering, drainage pipe, quality control, Huizhou City