摘要
姚江桥设计方案新颖,尤其是两座高度125.5m和128.5m的钢塔的加工吊装难度很大,对于前期的造价风险控制也提出了更高的要求。该文简单介绍了一般的风险控制手段在姚江桥的简单应用,使得工程造价得到有效控制。
The design scheme of Yaojiang Bridge is novel, and especially the processing and hoisting of two 125.5-m and 128.5-m high steel pylons are more difficult. The higher requirement is also put forward to the risk control of the construction cost in the early period. The article briefly introduces the simple application of the general risk control means in Yaojiang Bridge to make the engineering construction cost be efficiently controlled.
出处
《城市道桥与防洪》
2008年第8期147-149,共3页
Urban Roads Bridges & Flood Control
关键词
姚江大桥
钢塔
造价
风险
识别
控制
宁波市
Yaojiang Bridge, steel pylon, construction cost, distinguishing, control, Ningbo City