摘要 综合应用了4D技术、虚拟现实技术、工程数据库,研究开发了建设工程项目4D可视化动态管理系统.该系统通过建立施工现场的3D可视化模型与工程相关资源的集成,形成了4D施工模型,实现了建设工程项目的进度、人力、材料、设备、成本和场地布置的4D动态集成管理,以及整个施工过程的4D可视化模拟,为工程管理人员提供了科学、有效的辅助管理手段,从而更有利于保质、按时、低耗地完成各项工程任务. The integrated four dimension system provides an opportunity to improve an existing construction schedule by identifying inconsistencies and out-of sequence activities; reducing missing activities; and improving the ability to communicate construction plan information. The potential benefits and challenges of using an immersive, three dimension virtual environment to view four dimension models is investigated in the four dimension system and the use of an immersive virtual environment is also included, which aims to improve the project planning process by generating and reviewing construction plans in a virtual environment.
出处 《东华大学学报(自然科学版)》 CAS CSCD 北大核心 2008年第3期344-346,354,共4页 Journal of Donghua University(Natural Science)
关键词 4D技术 可视化 过程模拟 资源管理 four dimension modeling virtual reality process simulation resources management
  • 相关文献

参考文献3

  • 1ZHANG Y, ZHANG J P, LI J L, et al. Research and Application of a 4D Construction Planning System for Construction Management [ C ] // In 1st International Construction Specialty Conference, Calgary, Alberta, Canada, May 23 - 26, 2006.
  • 2张建平,王鹏翔,郭建锋.基于Web和虚拟现实的建筑装修设计与管理系统[C]//第五届全国多媒体辅助工程学术会议.中国新疆,2002:226-233.
  • 3WOO M,NEIDER J,DAVIS T.OpenGL编程权威指南[M].第3版.北京:中国电力出版社,2001:10-60.

同被引文献35

引证文献5

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部