摘要
王家崖水库右坝肩渗漏是工程遗留的重大问题之一,工程建成最初曾采用了多种防渗措施进行处理但无明显效果。1974年8月改用混凝土沉井素土回填防渗墙方案进行处理,防渗效果明显。
The leakage of right dam abutment of Wangjiaya reservoir is one of big problems left behind the project construction. Although various measures of seepage control were used, there was no obvious effect after the project had been completed. In August, 1974, the scheme of plain soil backfull of concrete open caisson for seepage control was used, with good result.
出处
《杨凌职业技术学院学报》
2008年第2期52-53,共2页
Journal of Yangling Vocational & Technical College
关键词
王家崖水库
右坝肩
混凝土沉井
防渗
Wangjlaya reservoirs right dam abutment
concrete open caisson
seepage control