开行重载列车可以使沿线编组站到解系统作业效率提高,驼峰负荷降低,车列待解时间缩短,到发线通过能力提高,接车延误率变小。
The operation of heavy haul trains will improve the efficiency of arriving breaking up system of marshaling yards,lower the load of humps,shorten the duration of waiting for breaking up,enhance the capacity of receiving dispatching sidings and reduce the receiving delaying possibility.