期刊文献+

舟山灌门水道隧道最小岩石覆盖厚度研究

Study on Mininum Rock Cover for Zhoushan Guanmen Strait Tunnel
下载PDF
导出
摘要 总结了确定海底隧道最小岩石覆盖厚度常用的方法,并分析了各种方法的适用条件。基于大量弹塑性海底隧道稳定性数值分析,提出了最小岩石覆盖厚度的最小位移法判据。根据舟山灌门水道隧道地质勘察报告,选择海底深槽和钻孔位置5个控制性分析断面。分别依据上述各种方法确定了舟山灌门水道隧道拱顶曲线,最后给出了各个分析断面的最小岩石覆盖厚度建议值。 Minimum rock cover thickness is an important parameter in vertical alignment design of subsea tunnells, and affects subsea tunnel cost and security. General methods are summarized for determining the minimum rock cover thickness in subsea tunnel, including engineering analogy method and numerical analysis method. Additionally, appropriate conditions are analyzed for all methods. Minimum distance method is presented for minimum rock cover thickness based on a great number of numerical analysis experiences. According to the Zhoushan Guanmen Strait Tunnel geological investigation report, 5 key cross-sections are selected. Minimum rock covers for 5 key cross-sections are obtained based on three types of analogy methods and numerical methods. Finally, the design value of minimum rock cover is provided through integrative analysis according to the topographical and geological condition of Zhoushan Guanmen Strait Tunnel.
出处 《地下空间与工程学报》 CSCD 2008年第4期609-614,共6页 Chinese Journal of Underground Space and Engineering
基金 国家自然科学基金资助项目(No.50539080No.50574053)
关键词 海底隧道 最小岩石覆盖厚度 舟山灌门水道隧道 最小位移法 工程类比法 subsea tunnel minimum rock cover thickness Zhoushan Guanmen Strait Tunnel minimum distanee method engineering analogy method
  • 相关文献

参考文献11

二级参考文献73

共引文献352

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部