摘要
结合对离军高速公路第五合同段变间距双薄壁墩的施工,较为详细地阐述了变间距双薄壁墩使用滑模施工工艺及质量控制,从而为其他类似工程提供了参考借鉴。
Combined with the construction of changed separation twin thin wall pier of the fifth contract segment in the Li-Jun express highway, the technology and quality control of changed separation twin thin wall pier slip-form construction technology were discussed detailed, which provide references for the similar engineering.
出处
《山西建筑》
2008年第25期162-163,共2页
Shanxi Architecture
关键词
变间距双薄壁墩
滑模施工
质量控制
changed separation twin thin wall pier, slip-form construction, quality control