期刊文献+

上海某地铁车站室内模型试验降水沉降分析 被引量:7

Settlement Analysis of a Laboratory Model Test of Dewatering of a Metro Station in Shanghai
下载PDF
导出
摘要 随着城市地下空间的开发利用,深基坑工程越来越受到人们的关注,尤其是软土地区毗邻已运营地铁段的深基坑开挖更是一项高难度的工程。通过对上海地铁某站的室内降水实验,并在整理和分析了降水井水位和流量、孔隙水压力、分层沉降量、地表沉降量等各种监测数据的基础上,总结出了降水时影响沉降因素之间的关系,为之后的工程降水提供较好的设计经验和改善方案,确保了该地铁基坑工程施工的安全性和围护结构的整体稳定性。 With the exploitation of urban underground spaces, deep foundation pit constructions increasingly are evaluated. Pits in soft soil areas adjacent to operating subway are especially difficult to excavate. After indoor testing of water drainage for a station on the Shanghai Metro line 9, and on the basis of treatment and analysis of water level drain hole and flux monitoring data, pore water pressure, layered settlement and surface soil settlement, we summarize the relationship between factors influencing settlement during water drainage. This research offers design experience and blueprints for water drainage and ensures the safety of metro pit construction and enclosure structure stability.
出处 《重庆建筑大学学报》 EI CSCD 北大核心 2008年第4期68-72,共5页 Journal of Chongqing Jianzhu University
基金 国家自然科学基金项目(40372124)
关键词 地铁 室内模型试验 降水 渗透性 隔水层 孔隙水压力 metro laboratory model test water drainage permeability water-resistant layer pore water pressure
  • 相关文献

参考文献7

二级参考文献39

共引文献91

同被引文献49

引证文献7

二级引证文献20

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部