期刊文献+

基于PERT的项目工期风险传递机制 被引量:10

A Method of Project Schedule Risk Transmission based on PERT
下载PDF
导出
摘要 项目受本身及环境因素影响而产生工期风险问题,由于对工期风险发生机制缺乏正确的认识,给整个项目的风险管理增加了难度。基于此,从风险相关性的角度研究了基于PERT的项目单时段和全时段工期风险的形成以及传递机制,以期能更加准确地把握项目工期风险发生规律,为项目成功运行提供有效的决策支持。最后举例说明了该方法的具体运用。 Each project is unique and the problems encountered during the project cannot be forecast in advance, so there is a large element of risk inherent in every project. The proper management of risk in the project schedule will play an important part in determining the success of the whole project. This paper presents a current period risk management method and a study on the mechanism of project schedule risk transmission based on the PERT system to solve this problem. Accordingly the risk studied by considering multi-time sections and the correlativity of the project sections will provide decision-making information for the management team. Finally an example is given to illustrate the specific application.
出处 《工业工程》 2008年第4期14-18,共5页 Industrial Engineering Journal
关键词 项目管理 项目工期 计划评审技术 风险传递 project management project schedules PERT risk transmission
  • 相关文献

参考文献16

  • 1Abdalla M Odeh, Hussien T Battaineh. Causes of construction delay: traditional contracts [ J ]. International Journal of Project Management, 2002, 20(1) :67-73.
  • 2Ayman H, Al-Momani. Construction delay: a quantitative analysis [ J ]. International Journal of Project Management, 2000,18( 1 ) :51-59.
  • 3Malcolm D C, Roseboom J H. Application of a technique for research and development evaluation [ J ]. Journal Operations. Research, 1959, 7(5) :646-669.
  • 4付红,贾荣言,王霞,徐田柏.改进后的PERT方法在进度风险分析中的应用[J].价值工程,2005,24(8):121-123. 被引量:5
  • 5Giovanni Mummolo. PERT-path network technique: a new approach to project planning [ J ]. International Journal of Project Management, 1994, 12(2) : 89-99.
  • 6Hossein Soroush. Risk taking in stochastic PERT networks [J]. European Journal of Operational Research, 1993, 67 (2) : 221-241.
  • 7黄敏,李凤娥,王兴伟.基于PERT的虚拟企业风险评价模型[J].东北大学学报(自然科学版),2005,26(9):860-863. 被引量:9
  • 8Abbasi G Y, Mukattash A M. Crashing PERT networks using mathematical programming [ J ]. International Journal of Project Management, 2001,19 ( 3 ) : 181-188.
  • 9冯蔚东,陈剑,赵纯均.基于产品的虚拟企业工期风险控制研究[J].系统工程理论与实践,2002,22(2):55-60. 被引量:11
  • 10王卓甫,杨高升,杨建基,沈祖诒.水利水电施工中应用PERT的完工概率问题[J].河海大学学报(自然科学版),2002,30(1):44-48. 被引量:33

二级参考文献51

共引文献175

同被引文献104

引证文献10

二级引证文献69

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部