摘要
介绍了刘庄矿中央风井马头门的破坏和加固过程。对风井马头门破坏的原因、破坏后的修复加固、工程设计、施工技术等问题进行了探讨,从设计和施工方面,提出了保证马头门安全的技术措施。
The paper introduces the destruction and reinforce- ment of ingate of central air shaft in Liuzhuang coal mine, dis- cusses destruction reason of the shaft ingate as well as its repair, reinforcement, engineering design and construction technology" after destruction, brings forward some technical nleasures to en- sure the shaft of ingate safety in terms of design and construction.
出处
《矿业研究与开发》
CAS
北大核心
2008年第4期19-21,共3页
Mining Research and Development
关键词
马头门
破坏原因
支护
预探预测
Ingate, Destruction reason, Support, Exploration and prediction