摘要
现行的无节拍流水进度编制方法编制的施工进度计划表难以反映关键路线,得出的工期长而且偏差大。基于关键路线法提出了无节拍流水施工进度计划编制的改进方法,取得了满意的效果。
Construction progress chart compiled with flow process without steps is difiqcult to show the critical path. The construction period is long and difference is large. Based on critical path method authors provide improvement method on progress compilation methods of flow process without steps which gains satisfying effect.
出处
《施工技术》
CAS
北大核心
2008年第8期7-8,48,共3页
Construction Technology
关键词
项目管理
无节拍流水进度
编制
改进
project management
flow process without steps
compilation
improvement