介绍云广±800 kV直流输电工程穗东换流站极母线平波电抗器的安装方法,对吊装设备进行计算及选择,对以后实际施工具有指导意义。
The smoothing reactor installation in Huidong converter station of Yun-Guang ± 800 kV HVDC is introduced and the hoisting equipment is analyzed and chosen,which can direct the actual construction hereafter.