摘要
驰度调整是500 kV输变电工程架线施工的一个关键工序。文中介绍了采用驰度综合调整法,可以较好的解决架线施工驰度调整问题。
For 500 kV transmission line stringing construction projects,the sag adjustment is a key process. The paper introduced a comprehensive adjustment method of sag,which can solve the problems of sag adjustment better in stringing construction.
出处
《湖北电力》
2008年第4期21-22,共2页
Hubei Electric Power
关键词
驰度
平衡挂线
驰度调整
sag
balance thread