协同产品开发中供应商介入时间对无效迭代影响研究 被引量:3

A Study of the Impact of Involvement Time of Suppliers on Invalid-iteration in the Product Synergic Development
下载PDF
导出
摘要 多企业组织协同产品开发中,供应商合适的介入时间是产品开发成功的关键因素之一。本文通过提出供应商知识累积曲线,刻画供应商知识累积的演化路径,建立信息单向依赖任务供应商介入时间模型,研究了在并行开发中供应商介入时间对无效迭代的影响,并通过数值算例验证了模型的有效性和可行性。最后对协同产品开发管理中供应商介入提出了建议。 In the product synergic development, involvement time of suppliers is one of the key points to product success. In order to research on the impact of suppliers time on invalid-iteration, A concept of knowledge Accumulation curve is introduced firstly, then a model on involvement time of suppliers is established based on information dependent of tasks and innovation of tasks. According to this model, some proposals are presented on management the product synergic development.
出处 《管理工程学报》 CSSCI 2008年第3期115-117,145,共4页 Journal of Industrial Engineering and Engineering Management
基金 国家自然科学基金资助项目(70472016)
关键词 协同产品开发 供应商介入时间 无效迭代 知识累积曲线 product synergic development involvement time of suppliers invalid-iteration knowledge accumulation curve
  • 相关文献

参考文献6

  • 1Juite Wang, Y.-C Hwang. A study of the impact of activity overlapping on development lead-time in design chain[J]. Joumal of the Chinese Institute of Industrial Engineers, 2005,22 (4) : 293 - 300.
  • 2Kfishnan V. Managing the simultaneous execution of coupled phases in concurrent product development [ J ]. IEEE Transactions on Engineering Management, 1996,43(2) :210 - 217.
  • 3Krishnan V., Eppinger S. D., Whitney D. E. A model-based framework to overlap product development activities [ J ]. Management Science, 1997,43 (4) : 43 - 451.
  • 4Browning T R, Eppinger S. D. Modeling impacts of process architecture on cost and schedule risk in product development [ J ]. IEEE Transactions on Engineering Management, 2002,49(4):428 - 442.
  • 5徐岩,姜澄宇,郑洪源,吴含前.并行工程中下游事件启动时刻研究[J].机械科学与技术,2005,24(1):115-118. 被引量:6
  • 6杨冰花,李华,汪应洛.产品并行开发过程中的风险分析[J].管理工程学报,2005,19(2):70-74. 被引量:2

二级参考文献14

  • 1Paashuis V, Boer H. Organizing for concurrent engineering: an integration mechanism framework [ J ]. Integrated Manufacturing Systems, 1997,8 ( 2 ).
  • 2Krishnan V, Eppinger S D, Whitney D E. Accelerating product development by the exchange of preliminary product design information[J]. ASME J. Mechan. Design, 1995,(117):491 -498.
  • 3Krishnan V, Eppinger S D, Whitney D E. Accelerating product development by the exchange of preliminary product design information[J]. ASME J Mechan Design, 1995,(117):491 -498.
  • 4V.Krishnan,Steven D.Eppinger,Daniel E.Whitney.A Model-Based Framework to Overlap Product Development Activites[J].Management Science,1997,43(4):437~451.
  • 5Jwan-PhilippeDeschamps P.Ranganath Nayak.产品神话[M].中国人民大学出版社,2003,3..
  • 6Ali A.Yassine,Kenneth R.Chelst,Donald R.Falkenburg.A Decision Analytic Framework for Evaluation Current Engineering[J].IEEE Transactions On Engineering Management,1999,46(2):144~157.
  • 7Tyson R.Browning,Steven D.Eppinger.Modeling Impacts of Process Architecture on Cost and Schedule Risk in Product Development[J].IEEE Transactions On Engineering Managment,2002,49(4):428~442.
  • 8罗伯特G库伯.新产品开发流程管理[M].机械工业出版社,2003,1..
  • 9Tyson R.Browning,John J.Deyst,Steven D.Eppinger,et al.Adding Value in Product Development by Creating Information and Reducing Risk[J].IEEE Transactions On Engineering Management,2002,49(4):443~457.
  • 10陈国权.并性工程管理方法和应用[M].清华大学出版社,1998,12..

共引文献6

同被引文献35

引证文献3

二级引证文献111

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部