摘要
针对武广客运专线武汉试验段黏土地基强夯处理工程实例,分析了强夯处理对黏土地基的处理效果,并提出了处理对策。
Based on the engineering experiment data of the construction project for the unsaturated clay foundation treatment on the Wuhan section of Wuhan-Guangdong passenger traffic special highway, this paper analyses the treatment effect of the unsaturated clay foundation with the dynamic compaction method, and then makes solution suggestions.
出处
《安全与环境工程》
CAS
2008年第3期114-116,共3页
Safety and Environmental Engineering
关键词
黏土
强夯
原位测试
CFG桩
clay
dynamic compaction
in-situ tests
CFG pile