摘要
综采工作面在回收时遇到特殊地质条件时所采取的非常规方案,有效的缩短了施工时间,保证了施工期间的通风断面,保证了施工安全。为综采设备回收总结了良好的经验,值得推广和应用。
When coming across some special geological conditions, the unconventional program should be adopted in recovering the face of the comprehensive mechanized coal mine. It can effectively abbreviate the time of a construction, guarantee sufficient ventilating cross - section and the security in the course of a construction. The program sums up many good experiences for recycling the equipment of the comprehensive mechanized coal mining, so it is worthy of promotion and application.
出处
《煤炭技术》
CAS
2008年第9期16-17,共2页
Coal Technology
关键词
设备回收
特殊条件
研究
equipment recovery
special conditions
recovery