摘要
在水电工程中经常遇到由于自然条件造成的无法直接施工测量,比如水域阻挡,山、树遮挡等。若是人为的去消除这些困难会延缓工程进度和增加工程成本。通过fx4800P程序型计算器编制一套小程序,可以很轻松的解决这一问题。
In the water and electricity project, we frequently can' t directly do engineering measurement because of the natural condition. Such as the waters preventing, the mountain and the tree covering and so on , If we artificial eliminates these difficulties then it will delay the project progress and increase the project cost. This article illustate how to set scripts with the fx4800P procedure to solute this question easily.
出处
《贵州工业大学学报(自然科学版)》
CAS
2008年第3期143-145,155,共4页
Journal of Guizhou University of Technology(Natural Science Edition)