摘要
简要介绍了京九线泰和赣江大桥吉赣段建设中在汛期应用浮动平台进行大直径深水钻孔桩施工技术和成功经验。
The technigue and successful experience for the application of floating platform to drilling stake construction of large diameter at deepwater in flood season is described briefly.This technigue is applied to the great bridge at Gan-River,Taihe County Ji-Gan section of Jingjiu Railway.
出处
《科技情报开发与经济》
1997年第2期41-43,共3页
Sci-Tech Information Development & Economy