托海水电站大坝运行20多年,迎水面部分出现了严重冻融损坏。本文对新能托海水电站及时修补消除大坝及附属建筑物的缺陷,提高其安全性,延长使用寿命方面所做的工作进行了全面介绍。
The dam at Tuohai hydropower station has been in operation for more than 20 years, and the concrete damage by freezing -thaw at water face is serious. This paper introduced the measures in aspects such as disease elimination, safety enhancement and life prolongation of dam and hydraulic structures.
出处
《大坝与安全》
2008年第3期73-74,共2页
Dam & Safety
关键词
托海水电站
冻融
修复
混凝土
Tuohai hydropower station
freezing-thaw
repaire
concrete