摘要
概述梧州市城市防洪工程河东防洪堤桂江段桩基础工程,重点介绍Ⅳ标段钻孔灌注桩施工工艺和质量控制情况。
A brief introduction was made on the pile foundation construction at the Guijiang segment of Hedong (east of river) flood dike in Wuzhou city, with emphasis put on the technology process and quality control of bored pile construction at the No. Ⅳ section.
出处
《广西水利水电》
2008年第4期49-50,55,共3页
Guangxi Water Resources & Hydropower Engineering
关键词
钻孔灌注桩
工艺
质量
控制
Bored pile
technology
quality
control