期刊文献+

基于边际效用的民机备件库存优化模型 被引量:4

Optimization model of spare parts inventory for civil aircraft based on marginal utility
下载PDF
导出
摘要 为了最大限度地发挥民机备件的保障作用,使各种备件的库存水平最优,在综合考虑备件的技术性、经济性与可获取性的基础上,以备件缺货导致的民机平均维修等待时间为优化目标,以总航材供应成本为约束条件,建立了民机备件库存优化模型。在对备件单位成本的边际效用进行分析的基础上,采用启发式算法对模型进行求解,得到备件库存水平的优化方案。实例验证表明:在给定供应成本约束条件下,与仅依据各种备件保障率的计算结果相比,实际维修等待时间缩短了11.5%,库存备件资金降低了27.5%,因此,该模型是客观有效的,可节约库存成本,显著提高飞机的利用水平。 In order to maximize the guaranteed effect of spare parts for civil aircraft and optimize the inventory level of each item, an optimization model of the inventory was presented to optimize the mean maintenance latency time of aircraft, the provision cost of total spare parts was taken as the constraint of the model, and the technical characters, economic characters and provision parameters of spare parts were taken into account. A heuristic algorithm was given to solve the model based on the marginal utility analysis of spare part unit cost, so that the optimum project of the inventory was found. Compared with the result calculated by item approach, the mean latency time caused by the shortage of spare part is shortened by 11.5%, and spare part budget is reduced by 27.5 %, so the model is validate and effective to economize inventory cost and improve the use level of aircraft. 1 tab, 11 refs.
出处 《交通运输工程学报》 EI CSCD 北大核心 2008年第4期73-76,共4页 Journal of Traffic and Transportation Engineering
基金 国家863计划项目(2006AA04Z427)
关键词 航空工程 民机备件 库存优化模型 维修等待时间 配件供应成本 边际效用 启发式算法 aviation engineering spare part of civil aircraft inventory optimization model maintenance latency time provision cost of spare part marginal utility heuristic algorithm
  • 相关文献

参考文献10

  • 1SCHROEDER R G. Managerial inventory formulations withstoekout objectives and fiscal eonstraints[J]. Naval Research Logistics, 1974, 21(3): 375-388.
  • 2COHEN M A, KLEINDORFER P R, LEE H L, et al. Multi-item service constrained(s, S) policies for spare parts logistics systems [ J]. Naval Research Logistics, 1992, 39(4) : 561-577.
  • 3RUSTENBURG W D, VAN HOUTUM G J, ZIJM W H M. Spare parts management at complex technology based organi- zations: an agenda for research[J]. International Journal of Production Economics, 2001, 71(1/2/3): 177-193.
  • 4王正元,李瑾,朱昱,宋建社.基于备件保障率的备件运行量模型[J].兵工学报,2006,27(6):1136-1139. 被引量:11
  • 5TIMMERS B. Pooling van repareerbare wisselstukken tussen luchtvaartmaatschappijen [ D]. Centrum voor Industrieel Beleid: Katholieke Universiteit Leuven, 1999.
  • 6SHERBROOKE C C. Optimal Inventory Modeling of Systems: Multi-Echelon Techniques[M]. Second Edition. MA: Kluwer Academic Publishers Norwell, 2004.
  • 7ALFREDSSON P, VERRIJDT J. Modeling emergency supply flexibility in a two-echelon inventory system[J]. Management Science, 1999, 45(10): 1416-1431.
  • 8LITTLE J D C. A proof of the queuing formula: L=λW[J]. Operations Research, 1961, 9(3) : 383-387.
  • 9KARUSH W. A queuing model for an inventory problem[J]. Operations Research, 1957, 5(5): 693-703.
  • 10伏宏勇.航空备件计划模型与方法研究[D].北京:北京航空航天大学,2003.

二级参考文献5

  • 1李建平.装备战场抢修理论与应用[M].兵器工业出版社,2000..
  • 2贾希胜 甘茂治.战场抢修力量建设与准备的思考[J].军械工程学院学报,1995,7(2):7-12.
  • 3李景文,毕义明,李红文,等.导弹武器系统工程[M].西安:第二炮兵工程学院出版社,1999:355-355.
  • 4曹军海,徐宗昌.以可用度为中心的备件库存模型[J].车辆与动力技术,1997(1):25-33. 被引量:7
  • 5李金国,丁红兵.备件需求量计算模型分析[J].电子产品可靠性与环境试验,2000,18(3):11-14. 被引量:62

共引文献16

同被引文献31

  • 1常文兵.MA60飞机初始备件计划方法研究[J].质量与可靠性,2005(3):24-26. 被引量:4
  • 2SHERBROOKECC.装备备件最优库存建模--多级技术[M].第2版.北京:北京电子工业出版社,2004.
  • 3SLAY F M, BACHMAN T C, KLINE R C, et al. Optimizing Spares Support:The Aircraft Sustainability Model[J]. Logistcs Management Institute, 1996 (10) : 22101 --22805.
  • 4CARRILLO M J. Extensions of Palm's Theorem:a Revievw, Management Science, 1991 (37) : 739 -- 744.
  • 5ALFREDSSON P. Optimization of Multi-echelon Repairable Item Inventory Systems with Simultaneous Location of Repair Facilities [J]. European Journal of Operational Research,1997(99):584--595.
  • 6DIAZ A, FU M C. Models for Multi-echelon Repairable Item Inventory Systems with Limited Repair Capacity [J].European Journal of Opetational Research, 1997 (97) .480--492.
  • 7ROTHKOPF M H, OREN S S. A Closure Approximation for the Nonstationary M/M/S Queue[J]. Management Science, 1979(25) 522-- 534.
  • 8MATTA I, SHANKAR A U. Z-Iteration: a Simple Method for Throughput Estimation, in Time-Dependent Multi-Class Systems[C].Proc ACM SIGMETRICS/PERFORMANCE, Ottwa, 1995.
  • 9Sherbrooke C C. METRIC: Multi-echelon Tech nique for Recoverable Item Control[J]. Operations Research, 1969,16 (1) : 122-141.
  • 10Graves S C. A Multi-echelon Inventory Model for a Repairable Item with One- for- one Replenish- ment[J]. Management Science, 1985,31 (10) : 1247- 1256.

引证文献4