摘要
针对朱家角老镇区祥凝浜路西段改造施工遇到的无法封闭施工、雨水出水总管因穿过居民小区百姓反应大、路基土质状况差、设计电力管道因原有架空电缆电杆阻碍无法施工等困难,通过采取完善合理的技术及施工处理方案,解决了所遇到的各种技术和施工困难,取得了良好的工程效果。
The reconstruction of the west section of Xiangningbang road in the old town area of Zhujiajiao meet some troubles for example, close construction cannot be realized, rain discharging pipe crosses residential area so residents complain a lat about that, poor soil condition, designed electricity pipe cannot construct because of the hindering of original cable poles. Suitable technonoly and construction processing plan are taken to solve the technical and construction difficulties, and it gets a good result.
出处
《山西建筑》
2008年第27期314-315,共2页
Shanxi Architecture
关键词
道路改造
技术处理
施工方案
顶管工艺
钢板桩工艺
highway reconstruction, technical processing, construction plan, pipe jacking technique, steel slab pile technique