摘要
结合广清高速公路连接线主线工程B1标现浇预应力混凝土连续箱梁的施工实践,介绍了现浇箱梁模板与支架的设计方法和施工质量控制,实践证明该设计方法与质量控制措施科学、合理。
Combined with the construction of pre-stressed cast-in-site successive concrete box girder in the mainline project B1 of the joint line of Guang-Qing freeway, it introduces the de-sign method of the forrnwork and support frame of cast-in-site box girders and their construction quality control. The practice proves this design method and quality control measures are scientific and reasonable.
出处
《山西建筑》
2008年第27期337-338,共2页
Shanxi Architecture
关键词
现浇箱梁
支架设计
质量控制
cast-in-site box girder, support frame design, quality control