期刊文献+

协同任务调度构架模型及关键算法研究 被引量:4

Research on architecture and key algorithm of cooperative task scheduling
下载PDF
导出
摘要 为提高协同工作平台服务系统的协同任务调度的柔性及系统的平台伸缩性,需要从调度过程、软件结构和调度算法等方面进行研究。首先提出协同任务调度软件构架模型,采用多种软件优化方法对构架模型进行优化。然后提出驱动协同任务调度的过程元模型。最后,研究协同任务调度中的成员指派过程的关键算法,给出算法的形式化描述,并对算法效果进行验证。该软件构架和算法在实际应用中取得良好效果。 To improve the flexility of task scheduling in cooperative work platform service system and the platform-flexibility of the system, the scheduling process, software architecture and scheduling algorithm is discussed. Firstly, the software architecture model of cooperative task scheduling is proposed and optimized by several model optimization methods, Secondly, process meta-model that drove cooperative task scheduling is proposed. Finally, key algorithm of member assignment which is formally described and validated is proposed. The architecture and algorithm get satisfied results.
出处 《计算机工程与设计》 CSCD 北大核心 2008年第16期4235-4237,4241,共4页 Computer Engineering and Design
关键词 协同任务调度 软件构架 模型优化 过程元模型 成员指派算法 cooperative task scheduling software architecture model optimization process meta-model member assignment algorithm
  • 相关文献

参考文献8

二级参考文献27

  • 1LITOIU M,TADEI R. Real-time task scheduling with fuzzy deadlines and processing times [J]. Fuzzy Set and Systems,2001,117(1) : 35-45.
  • 2TERRIER F,RIOUX L,CHEN Z. Real time scheduling under uncertainty [A]. Proceedings of the 4th IEEE International Confrence on Fuzzy Systems ( Vol. 3) [ C]. Piscataway, NJ,USA:IEEE Computer Society,1995. 1177-1184.
  • 3R A Botha,J H D Eloff. Separation of duties for access control enforcement in workflow environments[J].IBM System Journal,2001;40(3)
  • 4E Bertino,P A Bonatti,E Ferrari.TRBAC:A temporal role-based access control model[J].ACM Transactions on Information & System Security, 2001 ;4(3 ): 191~233
  • 5Wil van der Aalst,Kees van Hee.王建民,闻立杰等译.Workflow Management-Models,Methods and Systems[M].北京:清华大学出版社,2004:56~69
  • 6P Attie,M Singh,A Sheth. Specifying and enforcing intertask dependencies[C].In:Int'l Conference on Very Large Data Bases,Dublin,Ireland, 1993-08
  • 7M P Singh. Synthesizing distributed constrained events from transactional workflow specifications[C].In:Proceedings of 12th IEEE Int'l Conference on Data Engineering,New Orleans,LA,1996:616~623
  • 8Pinar Senkul,Michael Kifer,ismail H Toroslu.A Logical Framework for Scheduling Workflows under Resource Allocation Constraints[C].In: Proceedings of the 28th VLDB Conference, HongKong, China, 2002
  • 9Minxin Shen,Gwo-Hshiung Tzeng,Duen-Ren Liu. Multi-Criteria Task Assignment in Workflow Management System[C].In:Proceedings of the 36th Hawaii International Conference on System Sciences (HICSS'03)
  • 10James B D Joshi,Elisa Bertino,Basit Shafiq et al. Dependencies and Separation of Duty Constraints in GTRBAC[C].In :SACMAT'03 ,Como,Italy, 2003-06

共引文献439

同被引文献20

引证文献4

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部