1号高炉大修实绩 被引量:3

Achievements in the Overhauling of No.1 Blast Furnace
下载PDF
导出
摘要 1号高炉大修顺利完成,于1997年5月25日点火开炉。本次大修中,高炉炉体耐材、炉身冷却系统、炉前出铁场、水渣等系统均作了改进。炉体关键部位采用了高品质耐材,炉身增设中压不断水系统,炉前出铁场取消了沉铁罐,实现炉台平坦化,三电实现了一体化。另外,实施了炉前脱Si,喷吹重油改为喷吹煤粉,均采用了先进的新工艺。 No.1BF had its successful overhaul and was blown in on May 25,1997.During the overhualing,some improvements were made in the refractories for BF body,cooling system of BF shaft,casthouse and water slag systems:quality refractories were used in the key places of BF body,medium pressure consistant water supplying system was added to BF shaft,residual molten iron ladle was removed from the casthouse and the electric,instrument & computer(EIC) were integrated into one.In addition,advanced technologies have been introduced into the practices of casthouse desiliconization and pulverized coal injetion instead of heavy oil.
出处 《宝钢技术》 CAS 1997年第6期1-4,共4页 Baosteel Technology
关键词 高炉 维修 喷吹煤粉 除尘系统 炉前脱硅 Blast furnace(BF) Achievements of overhaul New technology
  • 相关文献

同被引文献11

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部