山东省张店钢铁厂利用原有设备,对热轧带钢车间的“二火成材”工艺进行半连续化改造,生产2.5~3.5mm×80~150mm的热轧窄带钢。实践证明,工艺设计合理,产品质量稳定,且节省了工程投资。
Used of original equipments to reform hot rolling strip plant form “two times heating into product” to “helf continuous running” for productionhot rolling narrow strip of 2 5~3 5×80~150mm in zhangdian iron and steel works,the practice has proved that this reforming process is reasonable,the product productivity is stable and a lot of engineering investment is saved.