期刊文献+

冬季早龄期混凝土表面保护时刻分析 被引量:1

Analysis on surface protection time for concrete at early age in winter
下载PDF
导出
摘要 通过仿真分析软件FZFX3D,以一个冬季开始混凝土浇筑的模型坝为例,计算了混凝土浇筑后表面一直裸露和浇筑后立即覆盖保温材料两种工况,分析了特定高程上混凝土的温度分布、热流量以及坝体整体温升,建议了冬季混凝土表面保护的最佳时刻。 Based on the simulative analysis software-FZFX3D, two different conditions: the concrete surface is to be covered with or without curing insulation material immediately after the placement are calculated by taken a model dam, of which'the concrete construction begins during winter, as the actual case, The temperature distribution, heat flux and temperature rise of the whole dam body on a specific elevation are analyzed, and then an optimal time to begin the concrete surface protection for the curing during winter is proposed herein as well.
出处 《水利水电技术》 CSCD 北大核心 2008年第9期63-66,共4页 Water Resources and Hydropower Engineering
基金 湖北省自然科学基金创新群体项目(2006ABC004)
关键词 早龄期混凝土 温度分布 热流量 散热强度 温升 混凝土保护 concrete at early age temperature distribution heat flux intensity of heat emission temperature rise concrete protection
  • 相关文献

参考文献2

二级参考文献4

共引文献16

同被引文献6

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部