大型水泵直联排水系统水力过渡过程研究

Study on hydraulic transient process of drainage system with large scale series direct-coupled pumps
下载PDF
导出
摘要 基于特征线法对大型水泵直联排水系统的水力过渡过程进行了研究。以河南省某矿井直联排水系统为实例,利用仿真程序,针对该直联排水系统可能出现的2种产生严重事故后果的水力过渡过程进行了计算和分析,并进一步研究了泵出口阀门对系统过渡过程的影响。研究成果可为该类直联排水系统的安全运行、规避风险、提高系统可靠性提供技术依据。 Based on the method of characteristics, the hydraulic transient process of drainage system with large scale series direct-coupled submerged pumps is studied herein; for which a drainage system with the series direct-coupled submerged pumps for a mine in Henan Province is taken as the studying case. The hydraulic processes of two casualties those could oc- curred in the drainage system are analyzed and calculated with the simulation program concerned, and then the effect of the outlet valve on the hydraulic process of the system is studied as well. The study achievements can provide a technical basis for the safe operation, risk avoidance and increase of the rehability of the drainage system with he series direct-coupled submerged pumps.
出处 《水利水电技术》 CSCD 北大核心 2008年第9期83-85,94,共4页 Water Resources and Hydropower Engineering
基金 河南省自然基金项目(0311051800)
关键词 大型水泵 直联系统 水力过渡过程 数值模拟 阀门 关闭特性 large scale pump series direct-coupled system hydraulic transient process numerical simulation valve closingcharacter
  • 相关文献

参考文献6

二级参考文献10

共引文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部