筒仓沉井基础施工方法

Silo Sunk Shaft Foundation Construction Method
下载PDF
导出
摘要 以内蒙神华集团某矿矸石仓基础为例,介绍了筒仓沉井的施工方法,应根据施工工艺及工程情况确定施工方案,然后开始沉井制作,待混凝土强度达到设计要求时,可拆除刃脚架,井筒开始下沉,到达设计位置后,筒壁周围注浆,最后进行封底。施工过程中应注意测量控制、安全控制及下沉过程中对倾斜、位移、扭转的预防及纠正。 Takes gangue storehouse foundation of a mine in Shenhua group of Inner Mongolia as an example,introduces the silo sunk shaft's job practice, according to the construction craft and project situation determines plan of construction. Then starts manufacture of the sunk shaft, when the concretes intensity achieves the design require- ments, can dismantle the cutting edge frame, the well chamber starts to sink, after arriving designs the position, around the tube wall grounts, finally carries on the back cover. In the construction process pays attention to prevention and correction for the survey control, the safety control and in the sinking process to inclined, displacement, reverse.
作者 贺海珍
出处 《山西焦煤科技》 2008年第7期44-45,48,共3页 Shanxi Coking Coal Science & Technology
关键词 筒仓沉井 下沉 平稳 施工方法 安全控制 Silo sunk shaft Sinking Steady Construction method Safety control
  • 相关文献

参考文献1

  • 1建筑施工手册编写组.建筑施工手册.北京:中国建筑工业出版社,2003:451—519.

共引文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部