期刊文献+

Auto CAD 2008在矿山工程中的应用 被引量:2

Auto CAD 2008 applied in mining engineering
下载PDF
导出
摘要 介绍了用Auto CAD中的VBA进行二次开发而建立一个动态的矿床地质模型,并将矿床地质图形数据库、非图形数据库、各种生产报表及文档与Office2003有机地结合起来,使攀钢钒钛磁铁矿的地质、测量及采剥计划编制的工作可由计算机自动完成,为矿山数字信息化建设及应用搭建了最佳平台。 The VAD of Auto CAD is further developed to establish a dynamic geological model of ore deposit. Deposit's graph data bank & non--graphic data bank and various productions report forms & documentations are organically combined with Office 2003. Thus, the computer is able to accomplish automatically works related to geology, measuring and stripping plan compiling of Panzhihua vanadium--titanium magnetite mine; so an ideal platform for development & application of mine's digital informatization technology is built up.
作者 沈世荣
出处 《矿业工程》 CAS 2008年第5期59-61,共3页 Mining Engineering
关键词 AUTOCAD 2008 OFFICE2003 图形数据库 软件应用 Auto CAD 2008 Office 2003 graph data bank application of software
  • 相关文献

参考文献3

  • 1Auto CAD VBA二次开发教程.清华大学出版社出版.
  • 2攀钢集团矿业公司露天铁矿地质测量采剥计划动态信息系统用户使用手册.
  • 3攀钢集团矿业公司露天铁矿地质、测量、采剥计划信息系统技术报告.

同被引文献10

引证文献2

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部