摘要 隧道内防排水是一项复杂的工程,为使工程达到设计要求,在施工过程中,需结合现场水文地质资料,采取有效的措施.以大湾隧道防排水施工的为例,详细介绍了防水工艺中的防水板铺设前准备工作、防水板的铺设焊接、二衬防水混凝土施工、膨胀止水条和橡胶止水带施工等,以及排水施工中的洞内排水和洞外排水工艺.经过对防水板焊缝、防水混凝土进行检测,结果均满足设计要求,基本杜绝了渗漏水现象. It is a complicated engineering to proof and remove water in tunnel. In order to reach the engineering design standard, we should take some advantage measures that are based on the present situation of hydrological geology when we doing our cons-truction. For example, Dawan tunnel conducting work on how to proof water everywhere, consists the preparing work before paving up waterproof shelves, the conjioning work between shelves, the process of using two layers of concrete in building, and puffy and rubber process, as well as the skills of setting aside thewater in holes or outside. Through soldering the flashing and detecting the waterproof concrete, It turn out to be that all resultscan satisfied the design standard, essentially, we have put an end to the phenomenon of water corroding.
作者 刘全文
机构地区 宁夏交通科研所
出处 《宁夏工程技术》 CAS 2008年第3期249-251,共3页 Ningxia Engineering Technology
关键词 隧道 防排水 设计 施工工艺 检测 tunnel water proofing and removing design construction arts detect
  • 相关文献

参考文献3

  • 1中华人民共和国交通部.JTGD70-2004公路隧道设计规范[S].北京:人民交通出版社,2004.
  • 2中华人民共和国交通部.JTJ042-94公路隧道施工技术规范[S].北京:人民交通出版社,1995..
  • 3交通部公路科学研究所.JTGF80/1-2004公路工程质量检验评定标准(土建工程)[S].北京:人民交通出版社.2004.

共引文献96

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部