根据工程进展和实际施工情况,取消临时导流底孔。研究取消导流底孔后的导流规划、下闸封堵、防洪度汛。
According to the project progress and actual construction situation, the temporary bottom diversion outlets are removed. The paper studies the diversion plan, lower gate blockage, flood control.
关键词
取消
导流底孔
导流规划
下闸封堵
防洪度汛
Cancellation, Bottom Diversion Outlet
Diversion Plan
Lower Gate Blockage
Flood Control